Search Forum
Blog Entry# 3254737
Posted: Mar 31 2018 (09:33)
3 Responses
Last Response: Mar 31 2018 (17:55)
3 Responses
Last Response: Mar 31 2018 (17:55)
Commentary/Human Interest
SWR/South Western
karbang~ 1756 news posts
Work on a foot overbridge connecting Krantivira Sangolli Rayanna (Bengaluru City) railway station's Platform Number 10 with the city railway metro station is in the final...
2 Public Posts - Sat Mar 31, 2018
This is the connection between City Railway Station (Metro Purple Line) with PF-10 of the KSR Railway Station. The existing FOB there connected the Metro station to Old Mysore Road. They are extending it on the other side to PF-10.
The Kempegowda Majestic Interchange Metro Station is already connected to the subway that connects the BMTC and KSRTC bus stands to the railway station. I don't think there is any work going on there. This connection is 450m long.
Basically, if you need to go to the platforms 1-4 in KSR, it is...
more...
The Kempegowda Majestic Interchange Metro Station is already connected to the subway that connects the BMTC and KSRTC bus stands to the railway station. I don't think there is any work going on there. This connection is 450m long.
Basically, if you need to go to the platforms 1-4 in KSR, it is...
more...