Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Brindavan Express - ರೈಲು ಹೆಸರು ಬೃಂದಾವನ್ ,ಇದು ಯಾವಾಗಲೂ Number 1 - Vijay Baradwaj

Search Forum
<<prev entry    next entry>>
Blog Entry# 3267784
Posted: Apr 04 2018 (07:11)

No Responses Yet
Info Update
4294 views
2

Apr 04 2018 (07:11)   22501/SMVT Bengaluru - New Tinsukia SF Express (PT) | NTSK/New Tinsukia Junction (3 PFs)
guest
Entry# 3267784            Tags  
Northeast Frontier Railway
N.F.Railway authority has decided to upgrade the 22501 / 22502 New Tinsukia – Bangalore City – New Tinsukia express to modern LHB by replacing the conventional rake. The train which will start from New Tinsukia with full LHB composition w.e.f. 6th April 2018, will be the 10th fully LHB rake of N.F. Railway.
The LHB (Linke Hofmann Busch) coaches developed by Linke-Hofmann-Busch of Germany are designed for an operating speed up to 160 km/h and could go up to 200 km/h. The length of 23.54 m and a width
...
more...
of 3.24 m provide a higher passenger carrying capacity per coach apart from better passenger safety & comfort. The LHB coaches are made of stainless steel and the interiors are made of aluminium which makes them lighter as compared to the conventional rakes. The coaches are also considered to be "anti-telescopic", which means they do not get turned over or flip in case of a collision resulting lesser casualty.
The new composition of the train with LHB rake will be 1(one) AC two tier, 4(four) AC three tiers, 14 (fourteen) three tier sleeper class coaches, two brake, luggage cum generator car and one AC hot buffet car. Later on general second class coaches will also be added.
It is also to be mentioned that N.F. Railway has already set out with the target of converting all short distance passenger trains into DEMU (Diesel Electric Multiple Unit) rakes. For this Railway board has already been approached for additional rakes and DEMU maintenance facilities are being developed in all divisions of the railway.
The CC Will Like This Hopefully
LOCO-EOG-S14-S13-S12-S10-S9-S8-S7-S6-S5-S4-S3-S2-P C-S1-B4-B3-B2-B1-A1-GS-GS-EOG
Firstly Without GS It will be 22 Coacher
And after adding GS it will be 24 Coacher

Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy