Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Vivek Express: ऊंचे नीचे रास्ते और मंज़िल तेरी दूर.

Search Forum
<<prev entry    next entry>>
Blog Entry# 3356212
Posted: Apr 28 2018 (14:42)

20 Responses
Last Response: May 03 2018 (17:00)
1 Followers
Site-Related
8658 views
12

★★
Apr 28 2018 (14:42)   11301/Udyan Express (PT) | PUNE/Pune Junction (6 PFs)
KishorWhoAJE2here~
KishorWhoAJE2here~   8564 blog posts
Entry# 3356212            Tags   Past Edits
All IRI members friends.
As we are having data of train which are late arriving as seen from arr dep tab of many trains.The reasons of running late are best known to IR and RM.
We need to challenge this by doing a small contribution. And that is take screen shots of your area trains arriving late and publish them addressing to RM and copy to leading newspapers and your area MP MLA. If you feel it is right thing to do please do.
Translate to English
Translate to Hindi

6 Public Posts - Sat Apr 28, 2018

6 Public Posts - Sun Apr 29, 2018

7 Public Posts - Mon Apr 30, 2018

2109 views
0

May 03 2018 (17:00)
KishorWhoAJE2here~
KishorWhoAJE2here~   8564 blog posts
Re# 3356212-21               Past Edits
Indian Railways introduces one more tool to identify weak points : /news/post/335886
The Ministry of Railways has launched an e-inspection software, a mobile app and a web portal to eliminate paper-based reporting of various inspections and passenger grievance redress system.
The e-inspection module will enable railway officers deployed on footplate (travel in locomotive of trains for short distances), level-crossing, per-departure, on board and station inspections to upload their reports online.
The
...
more...
digital platform will serve as a tool for Management Information System to generate periodic reports on various aspects of sections, stations and trains.
Massive network
The Railway Board has generated 3,300 user names and passwords for officers across the network and designated the Senior Electronic Data Processing Manager in each division as the ‘admin’ of the system to ensure that the master data is entered as per the specification and given time-frame.
The e-inspection software and mobile application were developed by the Delhi Division under the direct supervision of the Transformation Cell of the Indian Railways.
“The relevant data from January 1, 2018 is being fed in the e-module. The overall statistics will help in identifying the weak areas both in train operations and passenger services. By collating the data at the national level, the Railway Board can assess the shortcomings and analyse the means to rectify them while taking policy decisions,” a railway officer said.

Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy