Search Forum
Blog Entry# 344031
Posted: Feb 06 2012 (15:09)
10 Responses
Last Response: Feb 06 2012 (15:52)
10 Responses
Last Response: Feb 06 2012 (15:52)
As per the latest reports, we can't expect introduction of so many trains in the Rail Budget 2012-13 bcoz Many Railway Divisions don't want new train to be introduced this Budget due to operational constraints
RM favours "Clone Train" ( a new concept of running a parallel train on the same route when WL reaches more than a limit )
Let us discuss about clone train;
Which...
more...
RM favours "Clone Train" ( a new concept of running a parallel train on the same route when WL reaches more than a limit )
Let us discuss about clone train;
Which...
more...
5 Posts
sir, so instead of using clones, it will be much better if the current capacity of busy trains be increased by adding 2-3 compartments more .
Here is the proof.
www.90di.com/trains/DHANBAD/DELHI/
Copy paste in your browser and see the 7th train in the list
I am pasting from the site. Amazing thing is that this site is showing a train which runs two years back. Is this site is not updated .
Depart Arrive Duration Transits Fare...
more...
www.90di.com/trains/DHANBAD/DELHI/
Copy paste in your browser and see the 7th train in the list
I am pasting from the site. Amazing thing is that this site is showing a train which runs two years back. Is this site is not updated .
Depart Arrive Duration Transits Fare...
more...
clone is good concept but passenger confused which is the original and which one is clone . demand route trains are already runs with 24 coach so extra coaches cannot attached .
2329 is running as 12329 and 2329A was given for clone train as you cannot give the same number to two train and this clone is not running . Check the 9th train in the link I provided which shows as 2329 and 7th train as 2329A