Search Forum
Blog Entry# 3459807
Posted: May 28 2018 (11:39)
11 Responses
Last Response: May 31 2018 (20:46)
11 Responses
Last Response: May 31 2018 (20:46)
May 28 2018 (11:39) 12294/Prayagraj - Mumbai LTT AC Duronto Express | JBP/Jabalpur (7 PFs)
UtkarshTiwariRewa~
UtkarshTiwariRewa~ 7551 blog postsAllahabad Lokmanya Tilak Terminus AC Duronto Express having a technical halt at Jabalpur Junction PF# 1, for traction change.
A train from NCR HQ going to CR HQ (same city different terminal) having a technical halt at WCR HQ.
There were total of 3 Tughlakabad WAP 7 at Jabalpur Junction during that time, one was lying on PF#1 (can be seen in last two pics), one was nearby Pitlines and the third one was with Green WAG 9 at the other end of PF 1 which was attached to our train.
DOP-...
more...
A train from NCR HQ going to CR HQ (same city different terminal) having a technical halt at WCR HQ.
There were total of 3 Tughlakabad WAP 7 at Jabalpur Junction during that time, one was lying on PF#1 (can be seen in last two pics), one was nearby Pitlines and the third one was with Green WAG 9 at the other end of PF 1 which was attached to our train.
DOP-...
more...
6 Public Posts - Mon May 28, 2018
1 Public Posts - Wed May 30, 2018
1 Public Posts - Thu May 31, 2018
I think the last EOG was on. I maybe wrong, but I think I heard an EOG on sound when the train passed Shridham (Can you Re-watch and confirm ? If you don't mind).
BTW is it possible to change loco while the train is in HOG mode ? Wouldn't it cut off power to the entire train. Plus I think EOG would also take a certain amount of time to start right ?
BTW is it possible to change loco while the train is in HOG mode ? Wouldn't it cut off power to the entire train. Plus I think EOG would also take a certain amount of time to start right ?
2 Public Posts - Thu May 31, 2018