Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

कोशी की जीवन रेखा — मानसी सहरसा रेलखंड - Prabhat Sharan

Search Forum
<<prev entry    next entry>>
Blog Entry# 3472270
Posted: May 31 2018 (14:19)

4 Responses
Last Response: May 31 2018 (15:50)
General Travel
2122 views
0

May 31 2018 (14:19)   12717/Ratnachal SF Express
venkat_vskp~
venkat_vskp~   6448 blog posts
Entry# 3472270            Tags   Past Edits
Even it starting on time at VSKP, mostly getting by the time it arrives DVD. Whats the problem ?
Translate to English
Translate to Hindi

1102 views
0

May 31 2018 (15:01)
VijayawadaJunction
VijayawadaJunction   8597 blog posts
Re# 3472270-1              
VSKP to DVD 17kms in 45mins such a lazy controlling by Ecor even SCR trolled it further between DVD AKP...
Translate to English
Translate to Hindi

987 views
0

May 31 2018 (15:07)
venkat_vskp~
venkat_vskp~   6448 blog posts
Re# 3472270-2              
Seems some works going on...All trains taking more than 30 min.
Actually VSKP outer needs remodeling and also 3 rd line. But they are not happening.
Translate to English
Translate to Hindi

1064 views
0

May 31 2018 (15:14)
VijayawadaJunction
VijayawadaJunction   8597 blog posts
Re# 3472270-3              
ECOR should stop trolling vijayawada bound trains in between VSKP DVD 45mins for 17kms is too much..this 17kms stretch is always unpredictable if you observe Vizianagaram bound trains hits MPS after crossing MIPM but BZA bound trains crawls till GPT cabin even after switching tracks at GPT train still struggles to hit MPS till duvvada.
Even SCR not innocent here they do some serious trolling around Thadi.
Translate to English
Translate to Hindi

876 views
0

May 31 2018 (15:50)
venkat_vskp~
venkat_vskp~   6448 blog posts
Re# 3472270-4              
Actually there is a huge curve after GPT and also gradient. Railways have NTPC lines which goes straight to duvvada which may reduce 2-3 km. But they never use those lines for passengers. Normally trains takes almost 10 min from PF to come out of outer due to curves. Needs more lines connecting to outer and 3 rd line helps to reduce the time. But ECoR not interested.
Even bulb line works also didnt moved.
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy