Even it starting on time at VSKP, mostly getting by the time it arrives DVD. Whats the problem ?
VSKP to DVD 17kms in 45mins such a lazy controlling by Ecor even SCR trolled it further between DVD AKP...
Seems some works going on...All trains taking more than 30 min.
Actually VSKP outer needs remodeling and also 3 rd line. But they are not happening.
Actually VSKP outer needs remodeling and also 3 rd line. But they are not happening.
ECOR should stop trolling vijayawada bound trains in between VSKP DVD 45mins for 17kms is too much..this 17kms stretch is always unpredictable if you observe Vizianagaram bound trains hits MPS after crossing MIPM but BZA bound trains crawls till GPT cabin even after switching tracks at GPT train still struggles to hit MPS till duvvada.
Even SCR not innocent here they do some serious trolling around Thadi.
Even SCR not innocent here they do some serious trolling around Thadi.
Actually there is a huge curve after GPT and also gradient. Railways have NTPC lines which goes straight to duvvada which may reduce 2-3 km. But they never use those lines for passengers. Normally trains takes almost 10 min from PF to come out of outer due to curves. Needs more lines connecting to outer and 3 rd line helps to reduce the time. But ECoR not interested.
Even bulb line works also didnt moved.
Even bulb line works also didnt moved.