Search Forum
Blog Entry# 3578081
Posted: Jun 27 2018 (12:52)
2 Responses
Last Response: Jun 27 2018 (13:04)
2 Responses
Last Response: Jun 27 2018 (13:04)
East Coast Railway (ECoR) today kick-started its first Mainline Electric Multiple Unit (MEMU) train in Odisha between Berhampur and Cuttack.
The specially designed train will replace and run as per the schedule of Berhampur-Cuttack-Berhampur Fast Passenger.
The MEMU will run six days a week. It will depart from Berhampur at 7.30 am and reach Cuttack at 11.30 am.
On Saturday, the train will run...
more...
The specially designed train will replace and run as per the schedule of Berhampur-Cuttack-Berhampur Fast Passenger.
The MEMU will run six days a week. It will depart from Berhampur at 7.30 am and reach Cuttack at 11.30 am.
On Saturday, the train will run...
more...
1 Public Posts - Wed Jun 27, 2018