Search Forum
Blog Entry# 3601912
Posted: Jul 05 2018 (06:56)
16 Responses
Last Response: Jul 06 2018 (08:42)
16 Responses
Last Response: Jul 06 2018 (08:42)
12 Posts
Doing full high speed run after NZM. Anyone know how much is the MPS of this route ?
Trip has ENDED.
Awesome journey. Arrived MTJ on time despite of 20 mins delay near NZM. Remained on time only because of too much slack in TT. 4th line construction in progress. Poles have been erected well before line construction. Some snaps will be uploaded soon from LDH departure, MTJ Yard, Vrindavan Road TB, LGD WAP 7 with LHB Haridwar express.
Awesome journey. Arrived MTJ on time despite of 20 mins delay near NZM. Remained on time only because of too much slack in TT. 4th line construction in progress. Poles have been erected well before line construction. Some snaps will be uploaded soon from LDH departure, MTJ Yard, Vrindavan Road TB, LGD WAP 7 with LHB Haridwar express.