Jul 05 2018 (20:52) TPJ/Tiruchchirappalli Junction (9 PFs)
ThamizhMaran~
ThamizhMaran~ 1490 blog postsWhich of these electrification of Sourthern Railway ( expert SA hrsa electrification )or Tamil Nadu should be completed at first . ( Please tell the reason in command )
NO vote
Main Line ( TPJ - TJ - VM ) AND MV - TVR
62%
39
TPJ - TJ - KIK / VLNK
14%
9
KRR - NMKL - SA
6%
4
SA - ATU - VRI
2%
1
SA - DPJ - HRSA - [BYPL]
16%
10
5 Posts
KRR-DG is electrified now, so is ED-KRR-TPJ. Only missing link is SA-KRR. If this opens up as all electric, there can be seamless connectivity to South TN from SA. Trains could be operated from South TN to MAS/MS/TBM via SA, JTJ. Since VM line is crowded already and DG-SA-MAS takes the same time as Mainline (DG-TPJ-MV-VM-SA), this line could be used.
SA- ATU - VRI electrification is needed to 22153 and 16857 trains more loco reversals and helpful to more trains passes through VGE and ATU stations , village peoples uses trains