Search Forum
Blog Entry# 3670963
Posted: Jul 30 2018 (11:52)
8 Responses
Last Response: Jul 30 2018 (13:00)
8 Responses
Last Response: Jul 30 2018 (13:00)
Anybody knows the reason why 16589 was delayed between RRB and DVG for 28/7 departure? Reached KOP 1 hr late.. and hence 16590 was also delayed by 1 hr 20 mins
3 Posts
U observed Latur-Bidar-YPR exp run today ?? SCR made it a scapegoat, they made their Garib Rath to overtake in GTL-DMM section & made our train to get delayed. When Latur Exp was at Vikarabad, Garib Rath was still at SC. What was the need for overtake in a saturated single line of GTL-DMM ..
No no, I am talking about 16589 SBC-KOP RC. 16589 doesn't have Vasco coaches.
Oh sorry i thought KOP-SBC but trains from Bengaluru towards UBL only got delayed but what is reason dont know and delay also in RRB/JRU-DVG section only i think.
16535 GG again delayed by 17 min between DVG-RNR and later delayed by 38min between RNR-HVR and covered delay and reach UBL on time but again 16 min between UBL-NGR adn 17 min delay between NGR-GDG.
UBL-NGR already doubled and commissioned but i think still minor works going on as trains cant get 16min delay simply on doubled section and it departed UBL RT.
UBL-NGR already doubled and commissioned but i think still minor works going on as trains cant get 16min delay simply on doubled section and it departed UBL RT.