#ShiradiGhat
Located at 889 m above MSL, this is where the ghat section begins. It took 2 Hrs 45 mins to climb down 55 Kms. It has 57 tunnels in the span of some 45 Kms. Finally climbing down to 114 m.
Ticket is inflated by 55 Kms.
.
From...
more...
Located at 889 m above MSL, this is where the ghat section begins. It took 2 Hrs 45 mins to climb down 55 Kms. It has 57 tunnels in the span of some 45 Kms. Finally climbing down to 114 m.
Ticket is inflated by 55 Kms.
.
From...
more...
11 Public Posts - Sat Aug 04, 2018
1 Public Posts - Sun Aug 05, 2018
3 Public Posts - Wed Sep 26, 2018
Yes. Poles are carried on Flat bed wagons along with Crane to lift & place them.
Also Block includes other works in different sections like preparation of OHE Foundation. For that The Cement Mixer, Materials, DG, etc are all carried on Flat bed wagons for working in Block sections.
Also Block includes other works in different sections like preparation of OHE Foundation. For that The Cement Mixer, Materials, DG, etc are all carried on Flat bed wagons for working in Block sections.
1 Public Posts - Thu Sep 27, 2018