Let's discuss about some new railway line proposals!!
Route cost appr. at ₹20 crores/km.
1) Bobbili Junction - Srikakulam Road via Razam. ₹1920 crores.
2) Vizianagaram Junction - Visakhapatnam Junction via Madhurawada, Gambhiram, Anandapuram (Fly Over Line through Visakhapatnam till Gambhiram.). ₹2240 crores, doubled as it is an elevated corridor.
3)...
more...
Route cost appr. at ₹20 crores/km.
1) Bobbili Junction - Srikakulam Road via Razam. ₹1920 crores.
2) Vizianagaram Junction - Visakhapatnam Junction via Madhurawada, Gambhiram, Anandapuram (Fly Over Line through Visakhapatnam till Gambhiram.). ₹2240 crores, doubled as it is an elevated corridor.
3)...
more...
9 Public Posts - Sun Aug 05, 2018
Ante bro.. VSKP station east end nundi tracks teesukuni.. o Fly over ekkinchi.. Metro rail laga Dwaraka Nagar, Maddilapalem( ikkada NH16 meeduga ), Madhurawada, Gambhiram daka NH16 meeda Fly Over meeduga vellaali tracks.. akkada kindaku digipoi Vizianagaram Road ki parallel ga Vizianagaram City bayata HWH line tho kalavali.. Madhyala nenu cheppina same places lo stations ravali.. idi chesthe rake reversal baadha undadu.. North Vizag ki railway connectivity vasthundi.. idi kakapothe Port Area meeduga ade East end ki same fly over meeduga bulb line vestharanta.. adi Navy area.. leniponi gola..