Let's discuss about some new railway line proposals!!
Route cost appr. at ₹20 crores/km.
1) Bobbili Junction - Srikakulam Road via Razam. ₹1920 crores.
2) Vizianagaram Junction - Visakhapatnam Junction via Madhurawada, Gambhiram, Anandapuram (Fly Over Line through Visakhapatnam till Gambhiram.). ₹2240 crores, doubled as it is an elevated corridor.
3)...
more...
Route cost appr. at ₹20 crores/km.
1) Bobbili Junction - Srikakulam Road via Razam. ₹1920 crores.
2) Vizianagaram Junction - Visakhapatnam Junction via Madhurawada, Gambhiram, Anandapuram (Fly Over Line through Visakhapatnam till Gambhiram.). ₹2240 crores, doubled as it is an elevated corridor.
3)...
more...
10 Public Posts - Sun Aug 05, 2018
No. 2 ayye pani kaadhu sir. Normal gaane elevated, electrified track (for Metro) ki cities lo almost 250 crores per km avutundhi. Adey main line trains (locomotive hauled trains) ki aithe, daniki atleast 1.5 times avutundhi.
And Vizag antha hilly region, so track lo gradients lekunda mainline trains velletattu kattalante just within the city line ke easy ga 5000 crores paina avutundhi.
Antha chesaka trains speed takkuva untundhi (heavy main line trains flyovers meedha speed ga vellalante chaala invest cheyyali), plus goods trains...
more...
And Vizag antha hilly region, so track lo gradients lekunda mainline trains velletattu kattalante just within the city line ke easy ga 5000 crores paina avutundhi.
Antha chesaka trains speed takkuva untundhi (heavy main line trains flyovers meedha speed ga vellalante chaala invest cheyyali), plus goods trains...
more...
4 Public Posts - Sun Aug 05, 2018