Let's discuss about some new railway line proposals!!
Route cost appr. at ₹20 crores/km.
1) Bobbili Junction - Srikakulam Road via Razam. ₹1920 crores.
2) Vizianagaram Junction - Visakhapatnam Junction via Madhurawada, Gambhiram, Anandapuram (Fly Over Line through Visakhapatnam till Gambhiram.). ₹2240 crores, doubled as it is an elevated corridor.
3)...
more...
Route cost appr. at ₹20 crores/km.
1) Bobbili Junction - Srikakulam Road via Razam. ₹1920 crores.
2) Vizianagaram Junction - Visakhapatnam Junction via Madhurawada, Gambhiram, Anandapuram (Fly Over Line through Visakhapatnam till Gambhiram.). ₹2240 crores, doubled as it is an elevated corridor.
3)...
more...
13 Public Posts - Sun Aug 05, 2018
Reversal avoid cheyyalante aa Bulb line okkate daari. Appatlo Navy vaadu permission ivvaledhu annaru. But aa proposal ni ECoR kuda serious ga teesukoledhu anukunta.
Goods anni Marripalem, SCMN, port yards ki velthayi kabatti, vatiki Bulb line avasaram ledhu. Only passenger trains ki maatrame upayogam. Probably Gopalapatnam-VSKP ni tripling cheyyadam easy anukunnaru.