Which of the following projects in Andhra Pradesh should be given the highest priority??
ENDED
NO vote
New Railway Zone with existing WAT. BZA. GNT and GTL divisions.
0%
0
New Railway Zone with division reformation that gets the entire state under the same zone.
24%
5
CDO at PSA Palasa.
0%
0
2nd passenger terminal for VSKP.
0%
0
Bulb line for VSKP.
0%
0
TUNI - KTV new line.
0%
0
KK line doubling.
0%
0
BZA - VSKP line tripling.
0%
0
North bypass line at SLO for Kakinada City.
0%
0
Kotipalli - Narasapuram railway line.
0%
0
BDCR - KVR new line.
0%
0
NDD - BVRT - GDV - BZA. MTM - GDV. BVRT - NS line doubling and electrification
0%
0
Passenger trains in MTMI - VNUP new line.
0%
0
KI - BDCR new line
0%
0
BZA - KZJ line tripling.
0%
0
BZA - GDR line tripling.
5%
1
2nd passenger terminal for BZA
5%
1
Amaravati City new line.
0%
0
GNT - SC line doubling and electrification
33%
7
GNT - GTL line doubling
0%
0
Macherla - Nalgonda new line
0%
0
NDKD - KHT new line.
5%
1
Obulavaripalle - Krishnapatnam new line.
0%
0
DHNE - YNK line doubling.
14%
3
CDO at DMM Dharmavaram.
5%
1
NDL - YA line electrification.
0%
0
HX - BWT new line
0%
0
3rd passenger terminal for TPTY.
0%
0
TPTY - KPD line doubling.
5%
1
Mentioned in comments.
5%
1
3 Posts
8.
But all the 5 are equally important.
I am just picking based on the response of railways.
But all the 5 are equally important.
I am just picking based on the response of railways.
EP - AMVT - NBR single line will be constructed now.. AMVT - PKPU, SAP - NRT will be laid later based on demand..
As the poll ended, the majority goes to GNT - SC doubling and electrification!! Let's discuss why is it so important for Andhra Pradesh!!!