Search Forum
Blog Entry# 3709499
Posted: Aug 13 2018 (21:44)
12 Responses
Last Response: Aug 14 2018 (09:18)
12 Responses
Last Response: Aug 14 2018 (09:18)
7 Posts
As of Hassan-BAW-SBC line: Karwar-SBC night train slowed down by 25min.
Golgumbaz Exp even it reach UBL 3.20am but still same timing in UBL GDG SUR section because it looses it's convenient timings between UBL SUR so better make GG late departure from Mysuru but reduce journey time by increasing it's avg speeds over all its route..
Have they made RNR and HVR as temporary stoppages for 16535 GG??
And from when would these changes be effective ?
And from when would these changes be effective ?
Illa maga, Haveri, Ranebennur permanent halts afaik. Aadhare ee TAAG nalli yaake ee thara kottro gothilla. Should be with effect from 15th Aug 2018.
After they were given 3-6 months temporary stoppage crown it may be assumed that such halts long like regular ones