Search Forum
Blog Entry# 3743782
Posted: Aug 24 2018 (13:46)
3 Responses
Last Response: Aug 24 2018 (14:48)
3 Responses
Last Response: Aug 24 2018 (14:48)
Dear Yash ATM and Rahul ATM.Please mark Rajkharsawan to Bondamunda as Construction Tripling. I have visual proofs. 3rd line is being constructed and at the same time Electrification for the 3rd line too.
2 Public Posts - Fri Aug 24, 2018
Ok. I see. For everyone's info the third line is almost ready barring few area like tunnels level crossing. Electric poles have been laid and wiring is complete as well for most of the stretch.