Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Chennai EMU - என்னோட உயிர் டா நீ

Search Forum
<<prev entry    next entry>>
Blog Entry# 3769146
Posted: Sep 01 2018 (14:42)

No Responses Yet
General Travel
1320 views
0

Sep 01 2018 (14:42)   NDLS/New Delhi (16 PFs)
Rajz~
Rajz~   3600 blog posts
Entry# 3769146            Tags  
India's First High-Power Electric LocoFlagged off by Modi in April, Fails Test Run
New Delhi: The country’s first high-powered electric locomotive – flagged off with much fanfare by Prime Minister Narendra Modi in April 2018 – has failed its trial test.
Rolled out from Madhepura locomotive factory, a joint venture between French rolling stock major Alstom and Indian Railways, the first prototype of 12,000 horsepower (HP) electric locomotive has failed the performance test during the oscillation trial, according to people with knowledge of the matter.
“Performance
...
more...
test is essential for certifying the speed-related run of a new rail engine,” a senior Railway Ministry official told The Wire, and added that the “test trial was a failure as it witnessed defects in [the] suspension system.”
The railways wrote to Alstom in August, asking it to rectify the defects within 270 days, failing which the manufacturer would have to pay penalty as per the terms and conditions of the agreement.
Touted as a high-value FDI project in rail sector, the Rs 25 crore locomotive, considered to be the state-of-the-art, was launched for trial run by Modi with much fanfare six months ago.
As per the contract, the first five locos would be imported from France. All components would come from Alstom in France to be assembled at Madhepura. The first loco’s components were also imported and assembled in Madehpura before rolling off for a trial run.
“We have written as per the provisions in the agreement signed between Alstom and railways and are expecting the suspension problems will be rectified within the stipulated period. Otherwise the manufacturer will have to pay penalty,” said the official.
Currently the locomotive is stationed at Shaharanpur loco shed and Alstom engineers coming from France are expected to attend to the problems.
“Oscillation tests and trials are part of the series of statutory tests being carried out before the first loco enters revenue service. We will continue to conduct regular tests on several parameters, to make the electric locomotives world-class, ensuring full safety and reliability in line with international practices and standards,” Alstom said in a statement in response to the query over the trial failure.

Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy