Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Bandra Garib-Rath - नाम से गरीब, लेकिन मेरे दिल के करीब - Abdul Rehman

Search Forum
<<prev entry    next entry>>
Blog Entry# 3784265
Posted: Sep 06 2018 (20:03)

19 Responses
Last Response: Sep 12 2018 (22:28)
Rail Fanning
58060 views
22

★★★
Sep 06 2018 (20:03)   17212/Kondaveedu Express (PT) | MKL/Makalidurga (2 PFs)
SingleTraveller^~
SingleTraveller^~   3249 blog posts
Entry# 3784265            Tags   Past Edits
1 compliments
Omg pic more😲
Makalidurga to Devarapalle doubling along with electrification, is the target for this year.
-
The work is going on and is in various stages of completion.
-
The wiring is done at many parts
...
more...
of the section and at some places just the poles.
In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on.
All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.
At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.
-
-
Updated PF info (yet to be approved).
-

Translate to English
Translate to Hindi

4 Public Posts - Thu Sep 06, 2018

1 Public Posts - Fri Sep 07, 2018

4996 views
6

Sep 07 2018 (00:48)
SingleTraveller^~
SingleTraveller^~   3249 blog posts
Re# 3784265-6               Past Edits
After Dhone till Nandyal I was able to make out some land levelling work is going on.
-
The YA new line joins just before the Nandyala Junction cabin. So from Nandyala Jn cabin to the station a new line is to be laid this year.
There is nothing there or on the Kundu river after the cabin. But after the river some distance
...
more...
later, the track laying has been done and it continues till the station yard.
-
At Nandyal I saw the DHNE GNT passenger. Short-terminated I guess. Is getting WAP 7.
KRNT DEMU which was supposed to be there was nowhere to be seen, Late I guess.
Both Amaravati Exp and all passengers were with diesel. RC special was with WAP4.
-
Used to love this train for immediate travel, but nowadays the General coaches have gone down, as has the condition.
Reached DHNE just some 10-15 mins late. But then it was looped for so many times and reached GNT 1 Hr late. Then got stuck at KCC and finally pulled into BZA at 6:50.
-

Translate to English
Translate to Hindi

6 Public Posts - Fri Sep 07, 2018

3 Public Posts - Sat Sep 08, 2018

4 Public Posts - Wed Sep 12, 2018
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy