Search Forum
Blog Entry# 3827300
Posted: Sep 21 2018 (14:14)
1 Responses
Last Response: Sep 21 2018 (14:26)
1 Responses
Last Response: Sep 21 2018 (14:26)
IR Affairs
SR/Southern
A2Z~ 12817 news posts
CHENNAI: Southern Railway on Wednesday conducted the second trial run of RoadRailer, a bi-modal transportation unit, which runs as a semi-trailer on road and as a...
read more... Second trial run of RoadRailer completed
* Trials of Road railer were conducted about a decade ago by M/s Kirloskar & IR, but nothing concrete materialised.
* As long as tracks of IR are saturated, scope for new types of trains like RO-RO, RoadRailer are very limited
* Once the DFCs are commissioned, there shall be ample scope for such type of trains
* As long as tracks of IR are saturated, scope for new types of trains like RO-RO, RoadRailer are very limited
* Once the DFCs are commissioned, there shall be ample scope for such type of trains