Search Forum
Blog Entry# 3936041
Posted: Oct 25 2018 (09:34)
6 Responses
Last Response: Oct 25 2018 (19:59)
6 Responses
Last Response: Oct 25 2018 (19:59)
Oct 25 2018 (10:22) Kalinga Utkal Express (PT)/18477 Train - News
Its so boring out here in IRI
_V_K_^~ 46915 Conf TLs 225 Void TLs▶️Position of PC is different in every Rakes▶️RAKE 1 is completely reverse of the CC given below ▶️1st SLR is only for Ladies ▶️Last SLR is General + RMS▶️Rake 5 has AC coaches in the front , the CC is.. ( LOCO-SLR-GS-GS-A1-B4---B1-S12-S11-PC-S10----S1-GS-SLR)▶️Due to 3rd line work b/w Chakradharpur - Bondamunda , NI Block will be taken at Sonua , so this train will serve as a Passenger Train b/w Chakradhapur - Rourklea and will halt at each station enroute from 25.10.18 - 05.11.18
News Entry# 0
▶️Position of PC is different in every Rakes▶️RAKE 1 is completely reverse of the CC given below ▶️1st SLR is only for Ladies ▶️Last SLR is General + RMS▶️Rake 5 has AC coaches in the front , the CC is.. ( LOCO-SLR-GS-GS-A1-B4---B1-S12-S11-PC-S10----S1-GS-SLR)▶️Due to 3rd line work b/w Goilkera - Mahadevsal , NI Block will be taken , so this train will serve as a Passenger Train b/w Chakradhapur - Rourklea and will halt at each station enroute from 03.10.18 to 09.10.18
** Will be regulated by 30miniutes between jharsuguda and baradwar on 12.10.18 die to NI works at saragaon station
Past Edits
Updated: Oct 25 2018 (09:34) by _V_K_^~
Confirmed: Oct 25 2018 (09:34) by ^~
News Entry# 0
▶️Position of PC is different in every Rakes▶️RAKE 1 is completely reverse of the CC given below ▶️1st SLR is only for Ladies ▶️Last SLR is General + RMS▶️Rake 5 has AC coaches in the front , the CC is.. ( LOCO-SLR-GS-GS-A1-B4---B1-S12-S11-PC-S10----S1-GS-SLR)▶️Due to 3rd line work b/w Goilkera - Mahadevsal , NI Block will be taken , so this train will serve as a Passenger Train b/w Chakradhapur - Rourklea and will halt at each station enroute from 03.10.18 to 09.10.18 ** Will be regulated by 30miniutes between jharsuguda and baradwar on 12.10.18 die to NI works at saragaon station
▶️Position of PC is different in every Rakes▶️RAKE 1 is completely reverse of the CC given below ▶️1st SLR is only for Ladies ▶️Last SLR is General + RMS▶️Rake 5 has AC coaches in the front , the CC is.. ( LOCO-SLR-GS-GS-A1-B4---B1-S12-S11-PC-S10----S1-GS-SLR)▶️Due to 3rd line work b/w Goilkera - Mahadevsal , NI Block will be taken , so this train will serve as a Passenger Train b/w Chakradhapur - Rourklea and will halt at each station enroute from 03.10.18 to 09.10.18 ** Will be regulated by 30miniutes between jharsuguda and baradwar on 12.10.18 die to NI works at saragaon station
3 Public Posts - Thu Oct 25, 2018
That's vigilant for all.. comming back here... These codes that u used are nowhere seen but in back side of coaches , railways technical terms etc...while PC , CC are mentioned at every place , be it TB , Led display boards.etc...
2 Public Posts - Thu Oct 25, 2018