Search Forum
Blog Entry# 3948990
Posted: Oct 29 2018 (12:23)
5 Responses
Last Response: Oct 30 2018 (07:56)
5 Responses
Last Response: Oct 30 2018 (07:56)
IR Affairs
WCR/West Central
AdittyaaSharma^~ 70101 news posts
जबलपुर। जबलपुर स्टेशन से कटनी की ओर जाने और आने वाली 18 ट्रेनों के सफर में 20 मिनट कम हो जाएंगे। 1 नवंबर से इन ट्रेनों...
What kind of news is this!
The trains already get their loco links from JBP
The trains already get their loco links from JBP
Bull💩 😂 😂 . Already all trains towards SGO are halting at KMZ and running on electric traction.
I heard that the overbridge which connects KMZ with NKJ, which passes above KTES-KTE track has become a hurdle in electrification. Is that true?
Electrification has been completed in that section and it holds a neutral zone under the KMZ-NKJ bridge.