Search Forum
Blog Entry# 4022159
Posted: Nov 19 2018 (20:20)
33 Responses
Last Response: Nov 20 2018 (23:54)
33 Responses
Last Response: Nov 20 2018 (23:54)
Empty rake of Palnadu/Simhadri Express is being moved to Vejendla for stabling, to make PF-2 free for train operations during night.
DRUCC member and GNT DRM the vejandla - Tsundhuru Chord line is being proposed for restoration
DRUCC member and GNT DRM the vejandla - Tsundhuru Chord line is being proposed for restoration
16 Public Posts - Mon Nov 19, 2018
11 Public Posts - Tue Nov 20, 2018
It saves 15km, avoids Tenali station (which does not have many through lines) and the sharp curve outside Tenali towards GNT side which, for a freight train, can mean cutting down an hour of travel. The chord line also has a much better alignment than the route via Tenali, which would make it a preferred choice.
Also, it will effectively double the capacity between BZA-TEL/Tsunduru. When the chord line was opened, it was supposed to let SR use the BZA-GNT-Tsunduru line as a second line (the BZA-TEL route was still a single line), effectively making it a double line between BZA-Tsunduru. In the same way, now it will effectively make it a quadruple line.
Also,...
more...
Also, it will effectively double the capacity between BZA-TEL/Tsunduru. When the chord line was opened, it was supposed to let SR use the BZA-GNT-Tsunduru line as a second line (the BZA-TEL route was still a single line), effectively making it a double line between BZA-Tsunduru. In the same way, now it will effectively make it a quadruple line.
Also,...
more...
5 Public Posts - Tue Nov 20, 2018