Search Forum
Blog Entry# 4078085
Posted: Dec 07 2018 (20:22)
1 Responses
Last Response: Dec 09 2018 (00:46)
1 Responses
Last Response: Dec 09 2018 (00:46)
Coverage of speed trial run between the newly laid tracks between Chingavanam (CGV) and Changanassery (CGY) at a speed of about 110-120 KMPH. The two coached inspection train is powered by Royapuram (RPM) WAP 7 #30630.