Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

दूरी नही मंज़िल भारी, साथ हो जब मेट्रो हमारी - Mushfique Khalid

Search Forum
<<prev entry    next entry>>
Blog Entry# 4134342
Posted: Dec 22 2018 (09:50)

11 Responses
Last Response: Dec 22 2018 (15:31)
General Travel
43504 views
8

Dec 22 2018 (09:50)   UDZ/Udaipur City (5 PFs)
susmits~
susmits~   337 blog posts
Entry# 4134342            Tags   Past Edits
Electrification Update, Mavli Junction to Udaipur.

1. Electrification outside Mavli. The traction substation is fully set up (expect pics later this week!) and the junction itself is well wired.
2. Sectioning post just before Bhimal.
3.
...
more...
Lines leading into Bhimal.
4. Lines through Bhimal. Being a one platform station, it's wired using two poles, rather than a spanning portal.
5-9. The state of Khemli. Wires, but no catenaries yet. Lots of work remaining to be done. For some reason, the ICD is not being wired; I also saw this at Taj Nagar and Garhi Harsaru on the GGN-RE section. What's up with that?
10-12. The route between Khemli and Debari. Bare poles in some places, no poles for about five kilometers (including the cutting near Debari, not pictured here). Plenty of work remaining. In the distance, the mountain wall of Udaipur.
13-14. The curve preceding Debari. Poles and tubular supports, no wire.
15. Looking back towards Khemli from the curve.
16-18. The state of Debari. Most of the portals are done. Tubular supports, but no wires yet.
19-20. The Debari flyover, National Highway 48. No poles, and not even foundation work in much of the region. Not pictured: the cutting and 1:110 grade section below Ashapura Mata Mandir, where there's no work done. At the far end, there are some foundations, and a sectioning post in the very early stages of construction.
21. Poles resume 1 kilometer before RPZ, near the grid substation and Transport Nagar - Bhuwana bypass flyover.

Translate to English
Translate to Hindi

6 Public Posts - Sat Dec 22, 2018

6737 views
0

Dec 22 2018 (12:32)
Love114~
Love114~   1571 blog posts
Re# 4134342-7              
Block lekar complete kar sakte h
Translate to English
Translate to Hindi

4 Public Posts - Sat Dec 22, 2018
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy