After eight long years, MRTS on Velachery-St Thomas Mount stretch receives green signal
Picture source: click here
Picture source: click here
3 Public Posts - Wed Apr 15, 2020
I travel to work via the road below this line.
1. The bridge construction is complete except for the last 500 meter stretch near Mount.
2. The MRTS station will be on top of the existing Mount Metro station. So, the line will not merge with the existing MSB - TBM local train tracks.
3. Electric pole and track is also...
more...
1. The bridge construction is complete except for the last 500 meter stretch near Mount.
2. The MRTS station will be on top of the existing Mount Metro station. So, the line will not merge with the existing MSB - TBM local train tracks.
3. Electric pole and track is also...
more...