May 08 2012 (00:32) 54284/Lucknow - Sultanpur Passenger (UnReserved) | SLN/Sultanpur Junction (4 PFs)
JudgeSahab^~
JudgeSahab^~ 38109 blog posts• » α ¢αт¢н ƒяσм ѕυℓтαηρυя « •
LKO SLNPASS standing on PF#3 at SLN
captured by me on 4tH may while waiting for Shramjeevi express
LKO SLNPASS standing on PF#3 at SLN
captured by me on 4tH may while waiting for Shramjeevi express
56 Posts
WoW ... I am present in the Electric Lovers ... the catenary wires are looking just great. I even liked the Digital Clock at the station's platform. By the way, if I am not wrong then 97% of Electrification Work is complete between BSB and LKO via SLN. Right ? Gee ... :-))
hahahaha thats great if u r a ELEC lover then u should visit MGS elec yard u will see 50-60 locos :)
now the LKO-BSB is fully electrified but the wires are not live
changing of old signals to new electronic signals are also fully done but wiring is still to be done :)
just little work of FOB bridge is left then...
more...
now the LKO-BSB is fully electrified but the wires are not live
changing of old signals to new electronic signals are also fully done but wiring is still to be done :)
just little work of FOB bridge is left then...
more...
hahahaha thats great if u r a ELEC lover then u should visit MGS elec yard u will see 50-60 locos :)
now the LKO-BSB is fully electrified but the wires are not live
changing of old signals to new electronic signals are also fully done but wiring is still to be done :)
just little work of FOB bridge is left then...
more...
now the LKO-BSB is fully electrified but the wires are not live
changing of old signals to new electronic signals are also fully done but wiring is still to be done :)
just little work of FOB bridge is left then...
more...