Search Forum
Blog Entry# 4189930
Posted: Jan 07 2019 (16:06)
4 Responses
Last Response: Jan 08 2019 (11:48)
4 Responses
Last Response: Jan 08 2019 (11:48)
Jan 07 2019 (16:06) 12859/Gitanjali Express (PT) | BD/Badnera Junction (Amravati) (4 PFs) | BSL/WAP-4/22361
AweskhanTraveler^~
AweskhanTraveler^~ 56722 blog postsOvercrowd in Geetanjali SF Express at Badnera Junction because of removing coaches after LHBfication.
BSL WAP-4 #22361 with 12859 Geetanjali SF Express. First Time with Brand New LHB rake of Geetanjali Express at Badnera Junction.
Video content -
1. Geetanjali Arriving at pf 1 instead of pf 2 of Badnera Jn. Maiden run with Brand New LHB rake in down Journey.
2....
more...
BSL WAP-4 #22361 with 12859 Geetanjali SF Express. First Time with Brand New LHB rake of Geetanjali Express at Badnera Junction.
Video content -
1. Geetanjali Arriving at pf 1 instead of pf 2 of Badnera Jn. Maiden run with Brand New LHB rake in down Journey.
2....
more...
1 Posts
Kindly dont post anything which is unrelated to Railways
Thanks
Thanks
Badnera Jn badly needs one more platform. Most of the times, PF 2 is occupied by goods trains resulting trains coming from Akola end have to wait at outer. PF 3 & 4 are not capable of accommodating express trains as they are not long enough.
One platform can be constructed at old entrance side as there is good space available. Just some track work is needed.
One platform can be constructed at old entrance side as there is good space available. Just some track work is needed.