Search Forum
Blog Entry# 4191002
Posted: Jan 08 2019 (17:58)
5 Responses
Last Response: Feb 15 2019 (20:28)
5 Responses
Last Response: Feb 15 2019 (20:28)
Rameswaram: Soil-testing being done for new vertical-lift bridge which will replace the current Pamban sea bridge that uses 'Scherzer' rolling lift technology. #TamilNadu
Surely this will make probabilities of RMM getting Electrified :)
Also Nostalgic Pamban will be missed :(
Also Nostalgic Pamban will be missed :(
Tender called for new bridge
PAMBAN BRIDGE: Re-construction of Pamban Bridge parallel to the existing Br. No. 346 at KM 655/000 – 657/200, including vertical lift steel span between Mandapam and Pamban stations in Madurai Division of Southern Railway in the state of Tamil Nadu, India. Estimated cost of bid:- Rs. 195.64 Crores Bid security:- Rs. 2 Crores Pre-bid meeting:- 15.02.2019 at 11.30 hours
PAMBAN BRIDGE: Re-construction of Pamban Bridge parallel to the existing Br. No. 346 at KM 655/000 – 657/200, including vertical lift steel span between Mandapam and Pamban stations in Madurai Division of Southern Railway in the state of Tamil Nadu, India. Estimated cost of bid:- Rs. 195.64 Crores Bid security:- Rs. 2 Crores Pre-bid meeting:- 15.02.2019 at 11.30 hours