Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Purulia Express: লালপাহাড়ীর দ‍্যাশে যাবি? চিন্তা কিসের লো? বিকাল বেলা হাওড়া থেকে পুরুল্যা এক্সপেরেস পাবি। - Dip

Search Forum
<<prev entry    next entry>>
Blog Entry# 4197357
Posted: Jan 15 2019 (13:24)

17 Responses
Last Response: Jan 17 2019 (18:47)
Rail Fanning
21213 views
18

★★★
Jan 15 2019 (13:24)   56906/Hubballi - Solapur Passenger (UnReserved) | GDG/Gadag Junction (3 PFs) | UBL/WDP-4/20007
VinodArvind~
VinodArvind~   3429 blog posts
Entry# 4197357            Tags   Past Edits
1st time am meet Him and 1st pic of Him, is another than Solapur passenger.....
🚆 Hubli WDP4_20007 Fancy number.....
After Departure Gadag JN. Running fully speed ...
Translate to English
Translate to Hindi

9 Public Posts - Tue Jan 15, 2019

1 Public Posts - Wed Jan 16, 2019

5 Public Posts - Thu Jan 17, 2019

8915 views
1

Jan 17 2019 (16:33)
Irshad13~
Irshad13~   8102 blog posts
Re# 4197357-22               Past Edits
One more thing i need to clarify here is that Binkadkatti new double line is on left side and it stopped some distance after that LC gate where new ROB getting constructed and Beside that in right side it is Existing Hubli line and after that Bijapur line so if they want to merge to Existing Bijapur line they will be not stopping that line to the left side of existng UBL line it will be on right side. As per your guess if they want to merge like that means new line has to cross the existing UBL line so it will be not double line then as both UBL line get cross intersected. instead wat i guess the present UBL line will be just breaked and slightly curve it and join new stoped line and one more track the leftover track from binkadkatti side is joined to Bijapur...
more...
line making it UBL line and extra two new lines they might take for Bijapur for which we can see Bridge widening construction on the right side but we can have idea once we come to know width of extension of bridge. If its width more to ocupy double line then sure they doing same arrangement what i said here else their might be delay in UBL line to join GDG yard which can be done later but they cant join that UBL new left over line to Existing BJP line crossing Existing UBL straight line inbetween

Translate to English
Translate to Hindi

1 Public Posts - Thu Jan 17, 2019
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy