Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

ट्रेनों का सफर, ज़िन्दगी का सफर, रेलफैन दोनों में माहिर

Search Forum
<<prev entry    next entry>>
Blog Entry# 4202980
Posted: Jan 21 2019 (03:14)

37 Responses
Last Response: Apr 15 2019 (23:54)
Info Update
108865 views
7

Jan 21 2019 (03:14)   12559/Shiv Ganga Express (PT) | MUV/Manduadih (8 PFs)
ⓐⓙⓐⓨ~
ⓐⓙⓐⓨ~   41 blog posts
Entry# 4202980            Tags   Past Edits
वाराणसी - इलाहबाद मार्ग के दोहरीकरण व विद्युतीकरण के क्रम में वाराणसी से मंडुवाडीह के मध्य अब तक हुए कार्य को संलग्न रेखाचित्र में दर्शाया गया है. पहली लाइन का विद्युतीकरण हो चुका है. वाराणसी - मंडुवाडीह के मध्य दूसरी लाइन चालू हो गई है किन्तु इसका विद्युतीकरण पूरा नहीं हुआ है. मंडुवाडीह स्टेशन पर प्लेटफार्म नंबर एक का इलेट्रीफिकेशन हो चुका है पर इस लाइन पर अभी रिपेयरिंग हो रही हैं. मंडुवाडीह से आगे एक लाइन इलेट्रीफाइड है और दूसरी लाइन अभी बनी नहीं है.
मंडुवाडीह से गुजरने वाली 2 और लाइन हैं जो रिपेयरिंग के लिए ब्लॉक्ड हैं. इसमें से एक लाइन इंजन कारखाने (DLW) और FCI गोदाम को जोडती है. दूसरी लाइन जो मंडुवाडीह को लोहता से जोड़ती
...
more...
है, का इस्तेमाल नहीं हो रहा था. इसकी मरम्मत के बाद इस पर ट्रेन चलाने का प्लान है.
(21 जनवरी 2019 तक का स्टेटस)
Doubling and Electrification has to be done on ALD-BSB route. In this order, the progress between MUV - BSB section (3.5 km) is shown in the figure attached herewith. Up line is complete; downline is working but with precaution and it is not yet electrified. A third line from MUV to LOT is incomplete while DLW/FCI line is blocked and needs repair.

Translate to English
Translate to Hindi

10 Public Posts - Mon Jan 21, 2019

1874 views
2

Jan 21 2019 (15:01)
ManishSinghPRYJ~
ManishSinghPRYJ~   1321 blog posts
Re# 4202980-12               Past Edits
@4202980-1  @guest
Ald-Aly-Muv is fully electrified.
Only problem is that at Muv, only Platform 1 is electrified.
and from Muv to BSB, only one line fully electrified and on second one, work in progress.
So eloco train cannot run from Ald to Bsb, as if suppose, Vibhuti Up 12333 Express is allowed to run on the electrified track from Bsb to Muv, then its counterpart
...
more...
Vibhuti Down 12334 Express cannot run on eloco from Muv to Bsb as other track between Muv & Bsb not electrified. And thus 100 of electric engines will go to Muv but cannot come back. Similarly 100 of diesel engines will go to BSb from Muv but cannot come back.
Practically, this cannot happen, so till the time other (double one) track not electrifies, eloco will not run from Ald to BSB or beyond and vice-versa.
Second, Ald to Muv, two three trains can do run which have to be cumpulsorily started from/ terminated at Muv Platform 1 only.
isse achchha hai ek do hafte me IR itna sa bachaa hua kaam hi kar le pura.

Translate to English
Translate to Hindi

16 Public Posts - Mon Jan 21, 2019

6 Public Posts - Tue Jan 22, 2019

1 Public Posts - Wed Jan 23, 2019

1 Public Posts - Thu Jan 24, 2019

1 Public Posts - Mon Jan 28, 2019

1 Public Posts - Mon Apr 15, 2019
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy