Mar 20 2019 (14:02) BAY/Ballari Junction (Bellary) (4 PFs)
Deepeshparekh98~
Deepeshparekh98~ 197 blog postsWirinig ka kaam Ballari station pe ek dum fast chal Raha hai
Station ka look hi change ho Gaya ...
Station ka look hi change ho Gaya ...
15 Posts
Yes that's what I was thinking as their no such option in IRI which SWR doing now it's great simply... We can make option like Construction New Double Line + Electrification.. But for small bypass it's not necessary I think. We have any such kind of projects on entire IR where both new double line with RE taking place.. Even DFC's also not like this kind of think..
In DFC also double line+electrification is done at same time....in some other lines like Belapur CBD - Kharkopar also this was done
No idea whether there are other lines constructed in similar manner
Acha then for that purpose their never felt necessary that we should make new option in naming such lines in Atlas of IRI?