OHE Inspection Cars SWR+SCR running towards Joining Duty for Electrification Work
19 Posts
CRS done today from GTL to GPU viceversa 4.30 P.M to 7.30 p.m with 2 diesel loco engine.Yesterday a speed trial happened with double diesel locos between 6 PM to 9 PM.I think 100%successful with a speed of 100km/hr
Good ..thanks for Info ..when is Crs inspection for Khaderpet -Kalluru?
Yard modification happening at kalluru junction with additional two or three loop lines and the separate line which will connect to towards GTL.Major Penna bridge one is over and another parallel bridge is going to complete within 3 months.After that they will do inspection I think so
oh still 3 months.. i thought entire GTL -KALLURU will be double Electrified by march end .. when is double line Electrification CRS for GTL -GPU?
By tomorrow or within 5 days will get some information about Non interlocking and khadarpet to kalluru doubling & electrification status.From March 27 number of trains diverting via Arsikere,Rayadurg,ballari, Guntakal due to Non interlocking happening at yelhanka-penukonda section samewise they will also do Non interlocking at GTL