Apr 03 2019 (10:27) 11107/Bundelkhand Express (PT) | ALD/Allahabad (10 PFs)
ManishSinghPRYJ~
ManishSinghPRYJ~ 1321 blog postsRefer to blog post /blog/post/4259469 and my blog post /blog/post/3654115
I walked on ganga railway bridge (newly made one for doubling of Prayag-Phaphamau line) yesterday from south end (prg side) to north end (pfm side). I was surprised that from 04th March when kumbh mela ended, to 02 April, in less than one month, the remaining 04 beams is completed. Very fast work as 25 beams took more than two years. Now all 29 beams completed. Only gaps between some beams and side barriers at some places remains to be completed on the bridge. See pictures
Pic...
more...
I walked on ganga railway bridge (newly made one for doubling of Prayag-Phaphamau line) yesterday from south end (prg side) to north end (pfm side). I was surprised that from 04th March when kumbh mela ended, to 02 April, in less than one month, the remaining 04 beams is completed. Very fast work as 25 beams took more than two years. Now all 29 beams completed. Only gaps between some beams and side barriers at some places remains to be completed on the bridge. See pictures
Pic...
more...
3 Posts
Railway never wants to finish work in time. Prg Station se Rambag ROB ke 200 metres west tak double line daal di gayi thi teen mahine pahle hi.
But they are not starting work from this place to Ald station east place where Ald-Nyn NCR, Ald-Aly NER and Ald-Prg NR line meets.
This remaining work is only 400 metres out of which 300 metres already has a old line (military siding) of british era, whose sleepers have entered/pressed in soil and tracks have rusted. The railway just have to replace sleepers and tracks...
more...
But they are not starting work from this place to Ald station east place where Ald-Nyn NCR, Ald-Aly NER and Ald-Prg NR line meets.
This remaining work is only 400 metres out of which 300 metres already has a old line (military siding) of british era, whose sleepers have entered/pressed in soil and tracks have rusted. The railway just have to replace sleepers and tracks...
more...
Allahabad City- Jhusi bridge ka doubling ka koi update hai bhai aapke pass?
Nahi, wo abhi start bhi nahi hua
The ald-muv doubling has started from muv end, so daraganj to jhusi ganga bridge will be the last one to double ald-muv line
The ald-muv doubling has started from muv end, so daraganj to jhusi ganga bridge will be the last one to double ald-muv line