Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Purulia Express: লালপাহাড়ীর দ‍্যাশে যাবি? চিন্তা কিসের লো? বিকাল বেলা হাওড়া থেকে পুরুল্যা এক্সপেরেস পাবি। - Dip

Search Forum
<<prev entry    next entry>>
Blog Entry# 4293095
Posted: Apr 17 2019 (00:35)

21 Responses
Last Response: Apr 19 2019 (20:53)
General Travel
20707 views
7

Apr 17 2019 (00:35)   GKP/Gorakhpur Junction (10 PFs)
Ehtram Husain~
Ehtram Husain~   21904 blog posts
Entry# 4293095            Tags   Past Edits
1 compliments
गजब😍
Ner Railway Tender for Double Distance Signalling System(ABS) between Gorakhpur-Gonda -Barabanki Section (HDN Route) ....
Translate to English
Translate to Hindi

16 Public Posts - Wed Apr 17, 2019

9711 views
7

Apr 17 2019 (21:46)
TheMadrasMail~
TheMadrasMail~   6349 blog posts
Re# 4293095-17              
What you are describing is just MACL (Multi-Aspect Colour signalling). This is common all through-out IR on all routes, irrespective of the type of signaling (Absolute block or Automatic block).
What this tender is mentioning, are 'Double distant signals'. These are just warning signals that are placed a short distance before the actual signal. For example, if there is a signal at the entrance to a station, another warning signal may be placed roughly 1 KM before the station's signal. This will let the loco pilot know the status of the signal up ahead and prepare accordingly.
In
...
more...
case the signal at the station is showing Red, the distant signal will show a Yellow. If the station's signal is a Green, the distant signal will show a Green as well. Distant signals typically do not have a 'Red' indication. They only have Green and Yellow indicators and just serve as some warnings to the loco pilot, so that he/she will have some time to prepare for the next signal.
In some cases, there may be provision for a second distant signal, about 2km out from the main signal. I believe this is what the document is referring to as 'double distant signals'. In this case too, the same rules apply. These are just signals that let the LP know what the status of the main signal is. They can be passed at normal speed and the LP can choose to slow down afterwards, or if the LP feels that there isn't sufficient braking distance, he/she can start slowing down immediately.
This has got nothing to do with the type of signalling on the route. Distant signals are common on many routes.

Translate to English
Translate to Hindi

1 Public Posts - Wed Apr 17, 2019

3 Public Posts - Fri Apr 19, 2019
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy