Search Forum
Blog Entry# 4303174
Posted: Apr 27 2019 (16:40)
1 Responses
Last Response: Apr 30 2019 (15:21)
1 Responses
Last Response: Apr 30 2019 (15:21)
After rerouting of 5 pairs of trains via bypass of SRR, there is more slack in the TT of these trains.... Especially in case of 22646, 22648, 12522, and 12512, they reach WKI mostly around 12:45 - 13:00 instead of the given TT Time and reach CBE at 14:50 - 15:00.... And depart CBE at 15:40.... These trains even when reaches WKI at mentioned TT time, these slack managed by looping the trains at several stations.... But departs CBE at Crct time...... They should remake the TT to reduce this over slack or to make this slack at the end....
Yes.....all these trains have been given lot of slack. 13352 always reaches OTP at least 25-30 min before time. There have been few instances when 13351 has reached Allp almost 1 hr before time (19:30). Hopefully in the new TT from July-1 they will look at speeding up by 30 min at least otherwise there is no point in by passing SRR.
Already this was a point highlighted by few passenger associations in Malabar
Already this was a point highlighted by few passenger associations in Malabar