Search Forum
Blog Entry# 4307350
Posted: May 02 2019 (22:01)
1 Responses
Last Response: May 02 2019 (22:04)
1 Responses
Last Response: May 02 2019 (22:04)
IR main focus just remain on their prime sections like NDLS Howrah or say Agra Jhansi or Mumbai route. It's high time NDLS MB BE Lko and other routes like BBK GKP must be upgraded to handle high speed trains of speed upto say 200 kmph in future with fully automatic signalling system.
Besides late lateefi of trains must be checked. Time and fuel both are precious. NER and NR tussle keeps on delaying the trains and passengers keep playing twitter twitter with GM Saab n in Ministry
Hope things get...
more...
Besides late lateefi of trains must be checked. Time and fuel both are precious. NER and NR tussle keeps on delaying the trains and passengers keep playing twitter twitter with GM Saab n in Ministry
Hope things get...
more...
Abhi 130 to kar nahi pa rahe,, to 200 abhi bahot dur ki baat hai...