Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Talk to a RailFan - you will learn a LOT about Trains.

Search Forum
<<prev entry    next entry>>
Blog Entry# 4311566
Posted: May 08 2019 (01:22)

1 Responses
Last Response: May 08 2019 (04:35)
General Travel
45217 views
1

May 08 2019 (01:22)   16787/Tirunelveli - Shri Mata Vaishno Devi Katra Express (PT) | ED/Erode Junction (4 PFs)
KaveriMail~
KaveriMail~   827 blog posts
Entry# 4311566            Tags   Past Edits
Timings of both Navyug and Himsagar slip itineraries need to be standardized big time.
This train runs as 16787 from Tirunelveli to Katra 2 days a week, but it does not bear a return leg equivalent 16788, and instead has 2 different schedules depending on the linked train. Oddly, it is Navyug exp which covers lesser distance than Himsagar consumes a longer itinerary. SR must at least standardize the timings up to Salem/Erode whichever is the bifurcation point.
Translate to English
Translate to Hindi

43481 views
1

May 08 2019 (04:35)
jsk1991
jsk1991   39 blog posts
Re# 4311566-1               Past Edits
Navyug and Himsagar used to follow same time till erode..but they pushed Navyug to Andaman's slot once DDN/CDG-MDU became bi-weekly
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy