Margao: Part doubling of the Konkan Railway route, setting up of new stations, route electrification and other capacity enhancement works that are under way, will boost...
read more... Modernisation of Konkan Railway to boost tourism
13 Posts
MAO SVM and SVM QLM doubling works are going at great pace might get completed by Q2 or Q3 of 2021 if continues at same pace.
Regarding Majorda Vasco I had read somewhere on internet it was stuck due to some land acquisition around Vasco outers areas ie. as per a SWR official he did not mention objections at Majorda and Cansaulim.
There are some houses on the hills at VSG outers which needs to be destroyed so those people will have to be reallocated to other areas as compensation that...
more...
Regarding Majorda Vasco I had read somewhere on internet it was stuck due to some land acquisition around Vasco outers areas ie. as per a SWR official he did not mention objections at Majorda and Cansaulim.
There are some houses on the hills at VSG outers which needs to be destroyed so those people will have to be reallocated to other areas as compensation that...
more...
Is there enough space at Dabolim stn ? If yes, while Doubling SWR should seriously think of shifting MPT Main lines/Freight lines from Vasco stn. to Dabolim area. In that way additional Infrastructure for Passenger traffic can be utilised.
-
By the way, there is some land besides Vasco stn ( mostly south), near that school. Who owns that land any idea ?
-
By the way, there is some land besides Vasco stn ( mostly south), near that school. Who owns that land any idea ?
Dabolim there is not much scope. I think they are planning on laying some stabling lines at Chandor Railway station. There was a BTPN terminal at VSG on the tracks branching towards MPT demolished now also a BCNA loading was there. The tracks branching towards MPT there is scope to develop two to three stabling lines.
- doubling project of Konkan Railway was initiated by the then RM Mr. Prabhu.
- However, there were confusing reports in past regarding the project
- It was reported that Mr. Prabhu wanted to go for full stretch doubling of KR at cost of 10000-15000 Cr. Rs.
- Later it was reported that doubling shall be done in 3 patches i.e. from Roha...
more...
- However, there were confusing reports in past regarding the project
- It was reported that Mr. Prabhu wanted to go for full stretch doubling of KR at cost of 10000-15000 Cr. Rs.
- Later it was reported that doubling shall be done in 3 patches i.e. from Roha...
more...