Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Indian Railways: Divided By Zones, United By Railfans - Karthik

Search Forum
<<prev entry    next entry>>
Blog Entry# 4375481
Posted: Jul 11 2019 (20:34)

2 Responses
Last Response: Aug 14 2019 (00:03)
1 Followers
General Travel
42188 views
10

Jul 11 2019 (20:34)   NDLS/New Delhi (16 PFs)
MITRON
MITRON   55 blog posts
Entry# 4375481            Tags   Past Edits
🙏🙏🙏🙏 INDIA NEEDS HSR🙏🙏🙏🙏
INDIA needs HSR to compete with other World class Railways.
IR is Planning to have HSR(high speed rail above 200kmph) since 1987,but currently IR in 2019 has O kms of HSR.
On the other hand CHINA build it's 1st HSR in 2007 and currently they have 29000 kms of HSR Network.
IR
...
more...
currently has only 1 semi high speed track (160kmph) b/w Delhi-Agra.
IR is Far...Far behind from China OR in Modern Rail Technology.
IR is expanding (Doubling, electrifying,LHBfication) based on 130 kmph technology .But the Future is HSR,LHB(life span 25 yrs) manufactured now Will be in IR upto 2045,means IR will use them till 2045 and this create problem for efficient HSR network in India.
MCF Raebareli is going to manufacture 250kmph Aluminum coaches by 2021, which will be future proof for HSR but these LHBs and Vandebharts can go maximum 200 After doing expensive modifications in them.
Currently, IR is making records in manufacturing LHBs and Vandebharts (160 kmph) and feeling proud,but this is not future, future is HSR.
And we also feel happy by seeing this records and LHBfication.
Some people will say that we don't want HSR but we r comfortable with the conventional rail system if it runs at right time(punctual service).
But,I want to tell them IR can't be punctual because of Old signalling systems & 130 kmph technology.
SNCF submitted detailed project report for Delhi-Chandigarh-Amritsar(450 kms) HSR in 2015-16 projecting cost of 61000 cr Almost half the price of Mumbai-Ahemdabad corridor.This includes 300 kmph capable track, Advance signalling systems and Technology of Rolling stock.
But what happened to this project,we don't know.
Similarly many Routes were proposed but we don't know the progress of work.
In 2009 IR planned to have minimum 4 HRS route of length 2000 kms by 2020 under 'VISION 2020' but its 2019 we didn't see a single track.
HSR plays a very Important role in the development of Economy.so it's very Important us to have a good network of HSR.
I m not saying go directly for 350-380 kmph but IR should go at least for 200kmph.
Some links:
NHSRCL(SPV for implementing Mumbai Ahemdabad corridor)
click here
HSRC(RVNL subsidiary for HSR in India)
click here
IF u want to know more about HSR in India, I am attaching a PDF written by Gaurav Agarwal from RDSO.
Please,let me know your thoughts about HSR in India in the comments below.I wanted to write more but I will post it next time.
I hope you like this blog.
Thanks 😊.

Translate to English
Translate to Hindi

25226 views
5

Jul 12 2019 (20:01)
Deependra Gupta   241 blog posts
Re# 4375481-1               Past Edits
Inse electrification and doubling time p nhi hota hsr kha implement krenge. Lik k le lo 2050 tak b agr 2000km ka 350kmph ka track bana de to....Ye railway ka style h
Translate to English
Translate to Hindi

1 Public Posts - Wed Aug 14, 2019
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy