Search Forum
Blog Entry# 4378603
Posted: Jul 15 2019 (19:35)
18 Responses
Last Response: Jul 17 2019 (11:42)
18 Responses
Last Response: Jul 17 2019 (11:42)
Jul 15 2019 (19:35) QLN/Kollam Junction (Quilon) (6 PFs)
SreenathSree^~
SreenathSree^~ 8369 blog postsBrand new LHB rake at QLN yard most Probably For TVC Divn's Daily Konkan 16345/46 Netravati Express.
One rake at IPL, one at KPY and another one at TVC. More coaches yet to arrive for LHB fication of 16345/6, 16333/34
One rake at IPL, one at KPY and another one at TVC. More coaches yet to arrive for LHB fication of 16345/6, 16333/34
15 Posts
Even TVC is trying to limit the type of rakes they maintain to LHB & IRS only.
Towards this, they've returned all CBC rakes maintained by CD/TVC(mainly TVC - NZM weeklies) to SR/HQ and replaced them with ICF rakes.
Looks like the plan is to concentrate PM of all LHB rakes at KCVL. 12625/26 rake is maintained by KCVL, though train operates from TVC.
CD/TVC...
more...
Towards this, they've returned all CBC rakes maintained by CD/TVC(mainly TVC - NZM weeklies) to SR/HQ and replaced them with ICF rakes.
Looks like the plan is to concentrate PM of all LHB rakes at KCVL. 12625/26 rake is maintained by KCVL, though train operates from TVC.
CD/TVC...
more...
KCVL has 3 pit lines right? Or are there any more under construction.
The main thing what has be done is some more new pit line facility to be introduced in various stations. There was a proposal to start pit line facility at MAJN but now there is no news, In CAN and PGTN there are a lot of space which are not utilised at all. in the same way the PIT line at ALLP is also under utilised.