Search Forum
Blog Entry# 4393334
Posted: Aug 02 2019 (12:15)
6 Responses
Last Response: Aug 04 2019 (22:08)
6 Responses
Last Response: Aug 04 2019 (22:08)
Other News
SWR/South Western
SteelCityRF^~ 3184 news posts
Travelling by Bengaluru-bound Tipu Express from Mysuru has become a nightmare for hundreds of commuters all because of the failure of the train to adhere to...
1 Posts
Due to Siddhaganga Malgudi gets delayed near ypr so better to divert it via Bnc
Six days back i travelled in 12613 it departed MYS at 11 30 reached KGI around 13 10 and finally reached SBC at 14 25
is there any place to construct new pfs@sbc for permanent solution
Only solution it to remove the pitlines and shift it to binny mill land if this happens then around extra 4-5 pfs can be constructed on sbc otherwise there is no space to lay even a single track and if this not happens then pf 8 to 10 must be linked to bnc side and pf 1 to 7 must be linked to ypr side and pf 1 to 4 must be connected to kgi side
The extension of 16023 malgudi express till yelhanka is the reason behind this. To decongest at Yesvantpur, this step has been taken. Solution for all this problem is, malgudi express should get cancel from YNK to YPR and it should get the older time table. Leaving ypr at 1.15, reaching sbc at 1.25 n departing sbc at 1.30 or 1.35. Siddhaganga express should leave at 1 from pf-9, then this malgudi can get in to pf-9 at 1.25, and further tippu express 12613 can enter pf-9 by 1.45 or 1.50. Else malgudi express should be diverted by cantonment. Anyhow, proper maintenance can solve all the problems. Care should be taken.