Search Forum
Blog Entry# 4394532
Posted: Aug 04 2019 (10:08)
5 Responses
Last Response: Aug 26 2019 (10:54)
5 Responses
Last Response: Aug 26 2019 (10:54)
As per IRI, VSKP-R is electrified. Then why this runs with dloco?
Loop lines/station yard electrification is pending in TIG R section
Route is also mentioned wrongly, it should be Construction of double line, as doubling is in progress all the way till Raipur loco shed.
Till TIG Elocos running. May be soon VSKP -R we can see e locos.