Search Forum
Blog Entry# 4427567
Posted: Sep 14 2019 (17:02)
45 Responses
Last Response: Sep 15 2019 (09:39)
45 Responses
Last Response: Sep 15 2019 (09:39)
Journey Date: Sat Sep 14
Train Status: 3h 34m late
Last Update: URN/Utran 3.2 km<--->0.3 km ST/Surat @ Sep 15 2019 (09:39)
Speed: 4 km/h
40 Posts
On Trip
Late: 3h 30m late
SYN/Sayan 1.1 km<--->2.1 km GTX/Gothangam
Speed: 77 km/h
On Trip
Late: 3h 34m late
GTX/Gothangam 1.6 km<--->1.9 km KSE/Kosad
Speed: 19 km/h
Track Cleaning CO
Posted thru Follow my Trip
Posted thru Follow my Trip
On Trip
Late: 3h 35m late
KSE/Kosad 1.6 km<--->1.7 km URN/Utran
Speed: 106 km/h
speed gain
Posted thru Follow my Trip
Posted thru Follow my Trip
On Trip
Late: 3h 34m late
@ ST/Surat
Speed: 4 km/h
reached finally 3 day long journey ended here
Posted thru Follow my Trip
Posted thru Follow my Trip