Search Forum
Blog Entry# 4439824
Posted: Sep 27 2019 (11:42)
17 Responses
Last Response: Sep 27 2019 (12:39)
17 Responses
Last Response: Sep 27 2019 (12:39)
Sep 27 2019 (11:42) 22879/Bhubaneswar - Tirupati SF Express (PT) | TPTY/Tirupati (6 PFs)
VSKPSCoR^~
VSKPSCoR^~ 2613 blog postsOne more LHB train in ECoR w.e.f 28-09-2019
Image source :-
SCoR whatsapp group " Anu Bharadwaj "
Image source :-
SCoR whatsapp group " Anu Bharadwaj "
14 Public Posts - Fri Sep 27, 2019
Last minute 200-300 travelers will be there. 50% load gives railways profits as its DD and single rake doing both sides in a day. Normal CC with 9 coaches capacity is 702 seats.
Operation costs almost same. So for operational profits 50% demand is enough for DD type trains.
Operation costs almost same. So for operational profits 50% demand is enough for DD type trains.
2 Public Posts - Fri Sep 27, 2019