Search Forum
Blog Entry# 4440765
Posted: Sep 28 2019 (07:59)
6 Responses
Last Response: Sep 30 2019 (15:28)
6 Responses
Last Response: Sep 30 2019 (15:28)
Is there any construction at Parel Railway Station
And is it for Express trains Originating n terminating point
And is it for Express trains Originating n terminating point
1 Posts
Tq for ur info bro
Some body told that platform extension works r going on
Some body told that platform extension works r going on
Parel local train Terminus platform work has been completed some months back and Infact Parel locol has also started. Stil some activity work going on. But if you are talking about the express train terminus which is planned by making way at Parel Loco workshop then no.
Yes,
Iam telling about Express Terminal..
Somebody told that after completion of terminal LTT-KRMR shifted to Parel Station
Iam telling about Express Terminal..
Somebody told that after completion of terminal LTT-KRMR shifted to Parel Station
Same plan are also there for Jogeshwari Yard. It will be converted into terminal so that the load of BDTS and MMCT will be lowered. Hope to see this started soon.
False info. There is not even a part of contruction work started at Parel as far as outstation train terminus is concerned.