Search Forum
Blog Entry# 4454341
Posted: Oct 10 2019 (21:20)
48 Responses
Last Response: Nov 03 2019 (18:32)
48 Responses
Last Response: Nov 03 2019 (18:32)
Journey Date: Fri Nov 01
Number of Members on this Trip: 1
guest
TNGL/Toranagallu Junction --> UBL/SSS Hubballi Junction (Hubli)
Departure: Sat Nov 02 2019 @ 09:30
Train Status: on time
Last Update: @ UBL/SSS Hubballi Junction (Hubli) @ Nov 02 2019 (13:13)
Speed: 13 km/h
50 Posts
Can you tell electrification status of Gadag - Hubballi? I couldn't observe this stretch properly during my trip
OHE dugs were seen and in some place they were erecting pole. Pics not taken.
And I also spotted TWIN ET WDM3A 14099+16523 hauling flatbed loaded OHE portals.. in Bhanapur
Observation correction that was for Gadag-hospet section not for Gadag-Hubballi section
@Vishwanath joshi sir The electrification which was saw is of Gadag - Hosapete section. I was confused with UBL-GDG section.
As I cross checked it was of GDG-HPT section.
Sorry for inconvenience.
@Vishwanath joshi sir The electrification which was saw is of Gadag - Hosapete section. I was confused with UBL-GDG section.
As I cross checked it was of GDG-HPT section.
Sorry for inconvenience.