Search Forum
Blog Entry# 4476717
Posted: Nov 03 2019 (10:30)
3 Responses
Last Response: Apr 20 2020 (15:21)
3 Responses
Last Response: Apr 20 2020 (15:21)
Start a separate Telangana SK (Bi Weekly) from Kacheguda to NZM in the slot of 12753/54 from NED – NZM. So that Telangana region can have connectivity to NDLS. Telangana SK can have RSA with Marathwada SK since both are SCR trains.
in the return direction 3 days slot is available in 12630/22686 {Ka SK (via UBL)} slot from NZM to MMR. so 12754 can departure at 8.45 from NZM on Thursday and arrival at NED by 11.30. Telangana SK (Bi weekly) can also be started
127xx – KCG...
more...
in the return direction 3 days slot is available in 12630/22686 {Ka SK (via UBL)} slot from NZM to MMR. so 12754 can departure at 8.45 from NZM on Thursday and arrival at NED by 11.30. Telangana SK (Bi weekly) can also be started
127xx – KCG...
more...
If TG SK is to introduced it should take the Purna Akola Kandwa route the shortest then via MMR and save time for round about as Hyd itself is the crowd puller for the train. It should complete in 26 hrs. as TH also takes 26 hrs otherwise it cannot compensate on the load of TG
No purpose of serving ts then
Sc-nzm via nzb-krmr-peddapalli covers major ts area
Sc-nzm via nzb-krmr-peddapalli covers major ts area
Along with this train,NED JAT Humsafar Express should also get extend upto SC/HYD as SC/HYD needs direct train upto JAT