Search Forum
Blog Entry# 4481714
Posted: Nov 08 2019 (10:14)
5 Responses
Last Response: Nov 08 2019 (11:01)
5 Responses
Last Response: Nov 08 2019 (11:01)
Journey Date: Fri Nov 08
Number of Members on this Trip: 1
Tejk7529~
BTI/Bathinda Junction --> JIND/Jind Junction
Departure: Fri Nov 08 2019 @ 09:25
Train Status: 14m late
Last Update: MAUR/Maur 6.6 km<--->1.2 km KTKL/Kotli Kalan @ Nov 08 2019 (11:01)
Speed: 110 km/h
Trip Start Date: Today
BTI-ETW in Passengers And M/EX 😂
Onboard 54044 Upto Jind Hauled By CCTV Cab Equipped GZB P7 30766
BTI-ETW in Passengers And M/EX 😂
Onboard 54044 Upto Jind Hauled By CCTV Cab Equipped GZB P7 30766
On Trip
Late: 6m late
BTCC/Bathinda C Cabin 4.1 km<--->2.0 km KZW/Katar Singhwala
Halted
Arriving KZW PF2
Spotted at Platform#: 2
Spotted at Platform#: 2
On Trip
Late: 9m late
@ KZW/Katar Singhwala
Speed: 3 km/h
CCTV Cameras Equipped Cab GZB P7 30766 Hauling The Train
Posted thru Follow my Trip
Posted thru Follow my Trip
On Trip
Late: 10m late
XX-KZWO/Katar Singhwala Outer Cabin 2.2 km<--->5.0 km KTF/Kot Fatteh
Halted
On Trip
Late: 14m late
MAUR/Maur 6.6 km<--->1.3 km KTKL/Kotli Kalan
Speed: 110 km/h
220kmph xing😍 occured with 14725 a minute ago missed to see the link😢
Posted thru Follow my Trip
Posted thru Follow my Trip