Nov 12 2019 (21:42) GDG/Gadag Junction (3 PFs) | UBL/WDP-4D/40517
SrinivasPappu~
SrinivasPappu~ 4461 blog postsWindow Trial Inspection Special led by UBL WDP4D Twins Departs Gadag Jn
Date : 08-11-2019 . It was an unexpected capture and this train went towards Solapur Side
click here
Date : 08-11-2019 . It was an unexpected capture and this train went towards Solapur Side
click here
9 Public Posts - Wed Nov 20, 2019
5 Public Posts - Thu Nov 21, 2019
1 Public Posts - Fri Nov 22, 2019
1. New PF plan for GDG was done long back for that those Railway offices will be demolished. But i think still it will take more time to construct.
2. Yes they should atleast Commission Gadag Harlapur stretch but may be still they have some works left at Gadag outer towards Hospet.
3.UBL bypass already done up to that ROB after ROB that line diverts towards Bijapur line so for that a small station to be constructed on GDG HG line which will take still more time..
2. Yes they should atleast Commission Gadag Harlapur stretch but may be still they have some works left at Gadag outer towards Hospet.
3.UBL bypass already done up to that ROB after ROB that line diverts towards Bijapur line so for that a small station to be constructed on GDG HG line which will take still more time..